Support for Investments in Equipment and Infrastructure for Energy Efficiency, Energy Production and Storage

Environmental Fund

This Call for Applications (AAC) falls within the framework of the support scheme for investments in equipment and infrastructure in the fields of energy efficiency, energyproduction and storag

Programme Status

Open

Financing

Up to 80% Lost Fund

Territory

Mainland Portugal

Eligible Entities

Irrigation Associations
Dairy Producers
Agricultural and Livestock Producers – Efficient Water Use

Support for Investments in Equipment and Infrastructure for Energy Efficiency, Energy Production and Storage

Environmental Fund

This Call for Applications (AAC) falls within the framework of the support scheme for investments in equipment and infrastructure in the fields of energy efficiency, energyproduction and storag

Programme Status

Open

Financing

Up to 80% Lost Fund

Territory

Mainland Portugal

Eligible Entities

Irrigation Associations
Dairy Producers
Agricultural and Livestock Producers – Efficient Water Use

Incentive Conditions

  • This Call for Applications (AAC) falls within the framework of the support scheme for investments in equipment and infrastructure in the fields of energy efficiency, energyproduction and storag
  • Mainland Portugal.
  • Irrigation Associations
  • Dairy Producers
  • Agricultural and Livestock Producers – Efficient Water Use
  • Funding – 80%
  • Funding Limits
    • Maximum funding of €50,000 for applicants carrying out agricultural activities (Dairy Producers, Agricultural and Livestock Production), or €300,000 for the remaining categories.
  • Energy Efficiency Audit and Certification
    • Costs related to the contracting of audit and energy efficiency certification services, with a fixed cost per project.
  • Installation of Photovoltaic Panels
    • Aims to provide beneficiaries with autonomous energy production units, up to the limit of their self-consumption needs. Batteries may also be installed to increase energy autonomy during periods without energy production.
  • Installation of Batteries
    • For facilities where solar panels are already installed, ensuring the necessary energy availability during periods without production.
  • Air Conditioning Systems
    • Installation of high energy-efficiency air conditioning and sanitary water heating systems, either replacing existing systems or through new installations, with a fixed cost per installation
  • Solar Heating Systems
    • Complementary to heating systems, with a fixed cost per installation
  • Installation of Efficient Windows
    • Replacement of existing windows with more thermally efficient systems, reducing the energy consumption required for climate control in facilities
  • Lighting
    • Acquisition and installation of LED lighting systems.
  • Capacitor Banks
    • Installation of capacitor banks to correct the power factor, adjusting the production of reactive energy required for equipment operation.
  • Variable Speed Drives
    • Installation of variable speed drives in pumps and motors to adapt systems to actual operational needs, avoiding energy consumption peaks during start-up and adjusting consumption according to irrigation flow requirements at any given time.
  • Thermal Insulation Application
    • Application of thermal insulation on roofs and external walls. The acquisition and installation of panels for cold rooms or temperature-controlled preparation areas are excluded from this support.

Incentive Conditions

This Call for Applications (AAC) falls within the framework of the support scheme for investments in equipment and infrastructure in the fields of energy efficiency, energyproduction and storag

Mainland Portugal.

Irrigation Associations
Dairy Producers
Agricultural and Livestock Producers – Efficient Water Use

Funding – 80%
Funding Limits
Maximum funding of €50,000 for applicants carrying out agricultural activities (Dairy Producers, Agricultural and Livestock Production), or €300,000 for the remaining categories.

Energy Efficiency Audit and Certification
Costs related to the contracting of audit and energy efficiency certification services, with a fixed cost per project.
Installation of Photovoltaic Panels
Aims to provide beneficiaries with autonomous energy production units, up to the limit of their self-consumption needs. Batteries may also be installed to increase energy autonomy during periods without energy production.
Installation of Batteries
For facilities where solar panels are already installed, ensuring the necessary energy availability during periods without production.
Air Conditioning Systems
Installation of high energy-efficiency air conditioning and sanitary water heating systems, either replacing existing systems or through new installations, with a fixed cost per installation
Solar Heating Systems
Complementary to heating systems, with a fixed cost per installation
Installation of Efficient Windows
Replacement of existing windows with more thermally efficient systems, reducing the energy consumption required for climate control in facilities
Lighting
Acquisition and installation of LED lighting systems.
Capacitor Banks
Installation of capacitor banks to correct the power factor, adjusting the production of reactive energy required for equipment operation.
Variable Speed Drives
Installation of variable speed drives in pumps and motors to adapt systems to actual operational needs, avoiding energy consumption peaks during start-up and adjusting consumption according to irrigation flow requirements at any given time.
Thermal Insulation Application
Application of thermal insulation on roofs and external walls. The acquisition and installation of panels for cold rooms or temperature-controlled preparation areas are excluded from this support.

Other Grants

SI Circular Economy

SME Fund 2025

Start from Knowledge Program

Other Grants

SI Circular Economy

SME Fund 2025

Start from Knowledge Program